|
Products used on this project:
- Armstrong 600 X 600 Suspended Ceilings
- Lafarge Cormet Metal Stud
- Lafarge Cormet Suspended Ceiling
- Lafarge Wallboard
- Lafarge Toughcheck Wallboard
- Lafarge Double Check Wallboard
- Lafarge Bonding Compound
- British Gypsum Thistle Hardwall backing plaster
- British Gypsum Multi Finish
- British Gypsum Thistle Board Finish
- PFT G5 Projection Plaster Machine
Main Corridor of the school, during construction and the finished result. Please click on the pictures for a more detailed view. (Fast connection recommended).
|